e-Conic Cars Ltd
UK +44 (0) 1462 686682
 MOB +44 (0) 7528 811808
  • Home
  • Currently in the Workshop
  • Previously in the Workshop
  • Projects
    • Grey S1 FHC (AM)
    • White S1 OTS (SB)
    • White S2 FHC (MB)
    • Yellow S2 OTS (DE)
    • Yellow S2 OTS (MC)
    • Light Blue S2 2+2 (CG)
    • Green S1 OTS (JK-G)
    • 1962 OTS (AP)
    • S2 FHC (PB)
    • S1 OTS (Mich)
    • Bronze S1 FHC (JK-B)
    • Red S1 OTS (CB)
  • Cars for Sale
  • Press
  • Customer Feedback
  • Restoration
  • E Type Life
  • Shop
  • About us and Contact
22nd November 2019

The reservoir bottles are now fitted and plumbed in.
15th November 2019

The car is just about ready for delivery to the hood trimmer.  One job that we have to re-do is the set up of the front suspension - it is too low so we will have to re-check/set the torsion bars.
25th October 2019

The carbs have been fitted and the boot has been prepared for the fuel tank fit.  Vacuum pipes are in place.
18th October 2019

The build still moves on and the heater box with the upgraded fan, rear chrome, radiator etc have all been fitted.  The underdash heater vents are in place and we had to repair the hood frame pivot mounts prior to going away for powder coating.  We picked up the chrome plating today so that should start going on next week.
11th October 2019

Lots more small jobs finished this week and the handbrake is back from rechroming, built up and fitted, seatbelt plaque rivetted in position and brake lines finalised.
27th September 2019

The under bonnet is really coming together now.  The engine is now back where it belongs and we have the heatshields, alternator, cooling fan and lots of other small parts in place.  Just waiting for the new aluminium radiator to arrive so we can button up the front of the engine bay.
20th September 2019

Main focus this week and we are planning on the engine going in at the end of next week (dependent on all the parts arriving for the gearbox build).
 13th September 2019

Lots of work finished this week.  Engine bay coming along nicely, fuel line and back axle fitted.  Engine should be fitted end of next week.

We are always looking for ways to improve our cars and we have fitted some sound deadening foam to the outside of the transmission tunnel in an attempt to mute the mechanical noise from the gearbox.  We will report back in due course.
6th September 2019

All the wiring loom insulation is in place and the captive nuts have been tapped out.
30th August 2019

With the bonnet removed Murray has begun the Dynamat phase.  Next week we will lay out the components to put together our parts lists.
23rd August 2019

Good to have the car back now.  Build starts next week!
16th August 2019

The shell is finished in the paintshop and will be picked up next week.  Looking forward to starting the build proper on this!
9th August 2019

The boys at CCR have done a lovely job on the paintwork.  Not even polished yet!
2nd August 2019

The boys at CCR have been busy on the shell and the underneath and inside have been painted along with the frames and bulkhead.
19th July 2019

The car now has the first coat of primer applied.  Second coat next week and then paint.
12th July 2019

Dean and his team at CCR have been busy getting the shell ready for primer.  Won't be long before we are in paint now.
21st June 2019

The shell was delivered and taken straight over to the boys at CCR for paint.  The handbrake ratchet was stripped, checked and painted while the rest of the mechanism went away for plating.
14th June 2019

All the metal work is complete  and the dry build finished.  Looks absolutely stunning.  Meeting with the paint shop guys next week to finalise a few things.  A great job by Ray and the team.
31st May 2019

Steering column.  We had to repair the fracture crack prior to powder coating.
 24th May 2019

Our new trolley is built and the shell sits on it awaiting the fitting of the bonnet.
3rd May 2019

The stripping down of components continues and the steering column revealed a nasty crack.  This will be welded prior to blasting and powder coating.  Meanwhile the bodyshell is now finished while we await 2 components in order to get the bonnet built.  All the chrome has been trial fitted and we should be ready for paint very soon.
26th April 2019

Rear axle built up this week.
5th April 2019

The bodyshell is coming together nicely now and the doors have been reskinned and trial fitted.
1967 RHD Series 1 OTS

Brief for this car is a complete restoration.
29th March 2019

The ever lovely Carol dropped off the engine.  Looks fantastic!
22nd March 2019

Work is surging ahead now on the shell and the rear wings and tonneau panels are in position.  Starting to look like an E Type again!
1st March 2019

With the bodyshell in the bodyshop, we had to strip the bootlid springs down as they are needed for fitting up.  They are now being blasted and primed prior to us rebuilding them with new springs.  The dashtop vents have been stripped off ready for powdercoating and the drop glasses stripped and cleaned.
22nd February 2019

Lots more work on the S1 OTS (CB) and the pedal box is now finished.  The rear axle is also built up with all the new bearings etc and rebuilt diff.  The gearbox was split from the bell housing and everything cleaned up.  The magnet on the sump plug did its job and caught the remains of a bearing breaking up!  The front suspension bushes have also been fitted.

15th February 2019

The car is slowly coming back together and the shell is now finished.  Just the out panels to fit and we will be ready for paint.  The pedal box has been stripped and is ready for build up.

8th February 2019

The Powdercoaters and painters have been busy this last 2 weeks and we picked up the components for the Red S1 OTS (CB).  Its good when these items come back looking like new and we can start fitting up bushes etc.
18th January 2019

The rear axle is now stripped and ready for delivery to the powder coaters and platers.  We picked  up the reconditioned diff (new bearings, seals etc) yesterday so I look forward to that being built any time soon.
7th December 2018

We have stripped the rear axle and have started rectifying problems along the way.  The handbrake cage mounts had seized and broken off so these were replaced.  There is some damage to the top shock absorber mounts so these will be repaired when we get it back from the blasters.  The handbrake mechanism on one rear caliper had been well and truly bodged so we will replace the caliper.
23rd November 2018

As we are moving the workshop in the next few weeks Leon decided that it would be a good idea to strip down the bonnet.  Unbeknown to him there was a lot of repair work carried out and a number of panels were welded on.  The belly pan and diaphragms are scrap.  It is off to the blasters next week and we will see what we are left with!
2nd November 2018

More work on the wiper motor.  Stripping and cleaning carries on while the motor case now painted in the correct colour of silver hammer is waiting to have the field windings screwed in.
26th October 2018

The bulkhead repairs are now complete.  The wiper motor has been stripped and the relevant components sent off for powder coating.
21st September 2018

We picked up the 65 OTS (CB) from the Blasters in the week.  It has revealed a lot of small (bad) repairs but now we know what we have to deal with!
14th September 2018

More front suspension stripping. 
7th September 2018

The strip down continues and we turned our attention to the front suspension.  Not a pleasant job but it all has to be broken down to its component level.
31st  August 2018

The engine has now been split from the gearbox and delivered down to our engine rebuilders this week.
24th August 2018

Car now stripped down ready for blasting.  It didn't look bad but we saw beneath the shine to reveal a car that will need a lot of metalwork!